A concrete crossing for the creek across your road

Does the creek across your road wash out the ford after every hard rain? Low water crossings replace that ford with concrete. Pipes through the crossing carry the creek on normal days, and high water runs over the top. Terra Firma Earthworks builds them for private roads and township roads across the southern Missouri Ozarks.

In 2026 we built a concrete low water crossing about 200 feet long, from start to finish. Ten pipes run through it, and its banks are armored against the creek. Erosion control and road stabilization is the trade this company grew out of. A low water crossing puts that work in a creek.

What We Handle

  • Concrete low water crossings with pipes through them
  • Crossings for private roads and farm lanes
  • Work for townships and road districts
  • Pipes that carry the creek under the road on normal days
  • Creek banks armored against washouts
  • The dig and the concrete done by one company
  • Washed out road approaches regraded with new rock
  • A written quote after we look at the creek and the road

Request a Low Water Crossings Quote

Tell us about the job and where the land is. We look at it and put the quote in writing.

See the Work

Low Water Crossings on Video

Three short photo sequences of the crossing we built in 2026, each from a different side. Silent. Tap one to play. More of our jobs are on our work page.

Start to finish: the old broken crossing, the pipes, the rock base, the deck
The downstream side: pipes laid, the bank armored, the finished outlets
From the far end: the creek across the lane, the rebar mat, the finished deck

How Is a Concrete Low Water Crossing Built?

Building one starts with a look at the creek and the road. The Missouri Department of Conservation's best practices for stream work call for working during low flow when possible. They also ask that machines stay out of the water as much as possible.

Then we dig into the creek bed and set the pipes. Concrete goes in around and over them to make the driving surface. Missouri law has whoever does the digging contact Missouri 811 at least two working days ahead.

High water that runs over a crossing also hits the banks and the road at each end. The U.S. Forest Service's guide on low water crossings shows the approaches armored against erosion. The conservation department's best practices call for durable stone on banks that could wash out before plants take hold.

What Permits Does a Low Water Crossing Need in Missouri?

The Missouri Department of Natural Resources lists installing or replacing low water crossings as common Section 404 activities. Section 404 of the Clean Water Act covers placing fill in waters under federal jurisdiction. The U.S. Army Corps of Engineers issues those permits.

When the Corps requires a permit, the department adds its Section 401 water quality certification. It says most projects fall under nationwide permits that already carry that certification. An individual Corps permit needs an individual one from the state.

Your county may have a say too. If the crossing sits in a mapped flood zone, the county floodplain office may require a floodplain development permit. FEMA's Flood Map Service Center shows whether your site is in a mapped flood zone. We point you to each office early, and the permit decisions are theirs.

Low Water Crossings for Private Roads and Township Roads

We build low water crossings for landowners with a creek across a private road or farm lane. We build them for townships and road districts too. Drury, in Douglas County, sits at the center of our service area. It runs about 80 miles around Drury, the Springfield area included.

Our company built every part of the 200 foot crossing, from the dig to the concrete. Photos of that crossing are on this page. Excavation and concrete are the two trades of this company, and a low water crossing takes both. The same company pours concrete slabs for shops and barns.

Is the road washed out on each side of the creek too? Gravel driveway and road repair rebuilds it with new rock. Call or text (417) 259-2785 and tell us about your creek.

Concrete being pumped between culvert pipes set in wood forms for a low water crossing Crew compacting gravel beside culvert pipes set for a concrete low water crossing

Ready to get started?

Call or text for a written quote. We work about 80 miles around Drury across the southern Missouri Ozarks.

(417) 259-2785
How We Work

How a Job With Terra Firma Earthworks Runs

From the first call or text to the finished work, here is how it goes.

1

Call or Text

Call or text (417) 259-2785, or send the form. Tell us where the land is and what you want done.

2

We Look at the Job

We come out and look at the ground and the way in for the machines. You tell us what the land is for.

3

Your Written Quote

The quote comes in writing and spells out the work. You decide with it in hand.

4

The Work

On the day we set, the machines go to work. The job follows the written quote.

5

Ground Ready to Use

The job ends with open ground ready for what comes next. Where we dig, the site is graded and left clean.

FAQ

Low Water Crossings Questions, Answered

Common questions about low water crossings around Springfield and the southern Missouri Ozarks. If yours is not here, call or text and ask.

Call (417) 259-2785

How much does a low water crossing cost?
It depends on the creek and the road. A wider creek bed means a longer crossing, with more concrete and often more pipes. Rock for the banks and work on the road at each end add to it. We look at the creek and the road, then put the quote in writing.
Do I need a permit to build a low water crossing on my own land?
Owning the land does not settle it. The Missouri Department of Natural Resources says to contact the Corps of Engineers before any work in a waterway. The Corps decides whether your project needs a Section 404 permit. A mapped flood zone can bring a county floodplain permit too.
Why build a low water crossing instead of a culvert or a bridge?
A crossing that dips with the road tends to keep flood water in the creek, the Forest Service's guide explains. Water that backs up behind a plugged culvert can run down the road instead. The tradeoff is a closed road while the creek is up. The same guide says these crossings are typically a poor fit for busy, high speed roads.
What happens to a low water crossing when the creek floods?
It goes under, and it is built to. The Forest Service's guide describes low water crossings as designed to be submerged at some flows. The same guide notes that pipes can plug with debris. Once the creek drops, clear any logs and brush caught at the pipe ends.
Is it safe to drive across a low water crossing with water over it?
No. The National Weather Service says 12 inches of rushing water can carry away most cars. Its office in Springfield can name low water crossings at risk in flash flood warnings. Turn around, don't drown.
More From Terra Firma Earthworks

Work That Pairs With Low Water Crossings

New crushed rock gravel driveway loop around a grass island beside a fence, gravel driveway

Driveway and Road Repair

We rebuild washed out and rutted gravel driveways and private roads. Regrading, a crown, ditches, culverts and new rock get the water off the road.

Learn More
Freshly poured concrete slab inside wood forms with plumbing stub-ups at the edge of the woods, concrete slabs

Concrete Slabs

Concrete slabs and pads for shops, barns, garages and equipment, plus slab extensions. We dig and grade the ground first, then pour the footings and the slab.

Learn More
Creek bank armored with grout filled fabric bags below a row of culvert pipes, erosion control

Erosion Control

We lay erosion mats on bare slopes and cut banks, and we repair the washouts runoff leaves behind. The work starts with finding where the water comes from.

Learn More
Why Choose Terra Firma Earthworks

Land Clearing and Excavation Around Springfield

You Pick What Stays

Point out the trees you want to keep, and we clear around them. The cedar and brush go, and your trees stay standing.

Erosion Control Know-How

Erosion control and road stabilization is the trade this company grew out of. Slopes get erosion mats, and roads get shaped to shed water.

One Call Covers the Next Step

When the clearing is done, the excavation and concrete work can follow. You call or text the same number for both.

A Written Quote After We Look

We look at the land before we price the job. The quote comes in writing, and the work starts when you approve it.

Request a Quote

Get In Touch With Terra Firma Earthworks

Call or text (417) 259-2785, or send the form, and tell us about the land or the job. We look at it first, and the quote comes in writing.

  • Call or text (417) 259-2785
  • Serving Springfield, MO and the southern Missouri Ozarks
  • Written quotes · land clearing, excavation and concrete work

Request a Quote

Tell us about the job and where the land is. We look at it and put the quote in writing.

Call (417) 259-2785