Land clearing, forestry mulching and excavation around Springfield, MOLand clearing and excavation in Springfield
Terra Firma Earthworks
Finished concrete low water crossing with its armored bank and culvert pipes, our work
Job photos and clips

Our Work

Every photo and clip on this page is from our own work, shown in the order the job was built: a concrete low water crossing, a pad and slab at the edge of the woods, and a boat ramp. Call or text (417) 259-2785 for a written quote on yours.

On video

A Low Water Crossing, Start to Finish

Three short photo sequences of the concrete low water crossing we built in 2026, each from a different side. Silent. Tap one to play.

Start to finish: the old broken crossing, the pipes, the rock base, the deck
The downstream side: pipes laid, the bank armored, the finished outlets
From the far end: the creek across the lane, the rebar mat, the finished deck

How We Build Low Water Crossings

Site work and concrete

A Pad and a Slab, Start to Finish

Four photos of one job at the edge of the woods: the lot scraped to bare ground, the pad graded, the forms set over a rock base with the plumbing stubbed up, and the slab poured.

Lot scraped to bare rocky ground at the edge of the woods before the building pad goes in
1. The lot scraped to bare ground
Graded red clay building pad with a wheeled excavator at the edge of the woods, land grading
2. The pad graded
Wood slab forms set around a rock base with plumbing stubbed up and rakes laid out, concrete slabs
3. Forms set over the rock base
Freshly poured concrete slab inside wood forms with plumbing stub-ups at the edge of the woods, concrete slabs
4. The slab poured

See Our Concrete Slab Work

Boat ramps

How a Boat Ramp Gets Built

Four photos of one ramp, in order: the bed graded between the timber walls, the fabric form laid out, the form filled with concrete, and the finished ramp with a new walkway poured beside it.

Boat ramp bed cut and graded between timber retaining walls down to the water
1. The bed graded between the walls
White fabric concrete form laid out over the boat ramp bed between the retaining walls
2. The fabric form laid out
Fabric form on a boat ramp filled with wet concrete in a cobbled pattern between the retaining walls
3. The form filled with concrete
Finished concrete boat ramp running into the water with a new concrete walkway poured beside it
4. The finished ramp

Ask Us About a Boat Ramp

Request a Quote

Get In Touch With Terra Firma Earthworks

Call or text (417) 259-2785, or send the form, and tell us about the land or the job. We look at it first, and the quote comes in writing.

  • Call or text (417) 259-2785
  • Serving Springfield, MO and the southern Missouri Ozarks
  • Written quotes · land clearing, excavation and concrete work

Request a Quote

Tell us about the job and where the land is. We look at it and put the quote in writing.

Call (417) 259-2785